Businesses in Orlando must comply with local permitting procedures before installing exterior signage. The process includes application submission, plan review, engineering validation, and inspections.
Understanding the steps in advance improves approval speed.
Step 1: Proposal & Code Review
Verify that the proposed signage complies with Orlando’s land development code, including square footage limits and zoning allowances.
Step 2: Application Preparation
Submit required forms, property authorization, and notarized documentation.
Step 3: Plans & Engineering
Structural drawings must comply with Florida Building Code wind-load standards and electrical safety requirements if illuminated.
Step 4: Municipal Submittal
Applications are submitted through the city’s permitting system. Once accepted, a permit number is issued for tracking.
Step 5: Corrections (If Required)
If plan reviewers issue comments, revisions must be coordinated and resubmitted.
Step 6: Approval & Inspection
After approval, installation may proceed. Final inspections confirm compliance before closure.